Project: Retrofit

Location: Ottawa, ON

Our Role in the Project:

Annual support for portable classroom relocations for a local school board, including the disconnection, transportation coordination, and recommissioning of integrated technology systems. The scope included audio-visual equipment, network connectivity, and security infrastructure, ensuring systems were safely de-installed, reinstalled, and fully tested in new locations each summer. All classrooms were returned to operational readiness with minimal disruption to academic schedules.

Solutions Delivered:

  • Structured Cabling: Installation of optical and copper cabling to portable classrooms to support security, networking and paging.

    Technologies: Cable plant (Panduit, Superior Essex)