dvai_logo_2c.gif
Home Services Solutions Markets Log-in Contact

Enable Your Boardroom

Make your facility an outstanding automated presentation environment.

Considering New Technology?

Need to understand the impact a new technology may have on your business and network?

Analog Sunset

The days of analog are waning.  What does this mean to your AV system?

Data Center Design

With a new facility to move an existing data center to, a Government of Canada department engaged DVA to design and manage the move of their 5000 ft2 facility.  DVA was tasked as the project lead and worked diligently on behalf of the Crown to administer and manage the construction requriements and relocation of equipment.

Adopting Standards

Our design team leveraged the 942 Standard, and applied this as a baseline to determine the minimum tiering requirements.  This baseline provided the foundation for all decisions and justifications considered during the design phase.

  • Environmental conditions
  • Power conditioning and back-up
  • Wireless technology
  • Traffic audit

Cable Plant

By nature, a data center requires an extensive physical infrastructure to support the myriad of services found within. 

The original budget for interconnect cabling, provided by a local contractor, was projected at $1.4M, and consisted of a spiderweb of cabling that would be impossible to manage.

Our design team presented the Crown with a structured cable system to address their immediate and future needs, in a structured approach.  Further, we recommended a modular pre-terminated system to allow their staff to effect quick changes and upgrades without requiring outside technical support.

The resulting budget was reduced to $850K, and provided a much more robust system that is easily managed.

 

Work Undertaken

DVA was tasked with design, review and management of the following:

  • Tiering determination
  • Greening intiatives
  • Facility design
  • Space planning
  • Electrical systems
  • Cooling systems
  • Cable plant
  • Fire detection and suppression
  • Management

Newsfeed

3/1/2011 Audio-Visual Design

DVA to provides baseline design and documentation for 140-room audio-visual build.

 

1/15/2011 Network Stabilization

DVA chosen to upgrade entire network infrastructure for 400-bed long-term care facility.

 

9/30/2010 Data Center Design

DVA selected to represent Crown in design/build of major Government of Canada data center.

infocomm-4.jpg

Quick Links

Helpdesk Log-in

Audio-visual catalog

Careers

AV Industry News

Search

Enter search words

Follow Us